Acoustical Blankets Suspended Walls Installation

1. Layout and mark area to be enclosed.
2. While the hardware is on the ground, slide roller track (16 RT) through connectors to designated locations. To make sliding roller track into connectors easier, squeeze ends of roller track together as you slide into the end of connector. Where two pieces of track meet inside a connector make sure to deburr the ends of the track and push the butting ends together so that they fit snugly. This prevents the rollers from getting stuck in a “pot hole” inside the connector. Be sure to see the track orientation detail to ensure that the enclosure is assembled as designed.

Continue Reading...

GE Aviation – Acoustic Blanket ANC-AB12

GE Aviation contacted All Noise Control to help them solve noise control issues in their Plant located in Mcallen, TX. After discussing their application All Noise Control provided GE Aviation with a solution of ANC-AB12 to block and absorb noise coming from their mechanical equipment and through several openings.

Continue Reading...